This $632,500 project was to replace an existing pump station with a new 5.6 MGD pump station. The new structure was divided into two spaces. The electrical space contains the motor control center, emergency generator, and other miscellaneous electrical equipment. The other space is ventilated for sewer gas and contains equipment connections and a self-cleaning trench-style wet well with variable speed submersible pumps.