Balancing high-end image with affordable cost is always a challenge. The folks at Coos Bay Toyota were faced with not only these challenges, but with raising their existing facility above the 100-year flood plain while maintaining the operation of their critical internet sales presence. Double ‘E’ Engineering worked with the client’s IT providers to coordinate a design solution that met their needs. Expansion of the facility is planned for construction 2011/2012.