Bay Area Hospital

Double ‘E’ Engineering has provided designs for numerous remodels and upgrades for Bay Area Hospital on Oregon’s south coast.

  • Labor & Delivery
  • Bariatric Unit & Nurses Station
  • Boiler Replacement
  • Receiving/Physical Therapy/Storage
  • Parking Lot Lighting Upgrades
  • Women’s Imaging Facility
  • Radiation Therapy
 

Radiation Therapy planning required the replacement of old-technology x-ray simulation equipment with new computerized tomography equipment (CT Scanner) at the hospital’s Radiation Therapy Center.  The new equipment required an evaluation and upgrade of the electrical service entrance equipment, which was nearing full capacity.  Close coordination with the owner’s staff electrician and Siemens Medical was required to incorporate the manufacturer’s drawings and requirements into a comprehensive set of contract documents.  Electrical consulting services were provided through HGE, Inc. (Joe Slack, AIA).  Project costs were approximately $700,000.